
95 Developments
1571 Sandhurst Circle, Scarborough (Toronto), Ontario
Woodside Centre is a mixed-use project planned for 1571 Sandhurst Circle in Scarborough, within the City of Toronto. The development comes from 95 Developments and pairs residential suites with a mix of uses in one address.
Home layouts are set to span one-bedroom suites through to three-bedroom-plus-den plans. The project is at the pre-construction stage, and an occupancy date has not yet been announced.
Set within Scarborough's Agincourt area, Woodside Centre sits in a well-established east-end community served by a broad mix of everyday conveniences. The surrounding neighbourhood offers the shopping, dining, and services typical of this part of Toronto, with retail plazas and community amenities within reach of the Sandhurst Circle address.
As more location details are confirmed, this section will highlight the specific nearby destinations that matter most to residents.
Scarborough is well connected across Toronto's east end, with major routes such as Highway 401 running through the area and providing links across the wider GTA. The neighbourhood is also served by TTC bus routes and rapid-transit connections that tie into the broader Toronto network, making car-free trips practical for many residents.
Are you a real estate agent? Get commission details & broker portal access on LIQWD →
95 Developments is the builder behind Woodside Centre. As with any pre-construction purchase, prospective buyers should review the builder's disclosure materials and track record directly. Further details about the developer's work in the Toronto region will be shared as they become available.
Buying pre-construction in Ontario typically begins with registering for early access, which can put you in line for first looks at pricing, floor plans, and suite selection before broader release. Buying early in a release can matter because the best layouts and views often move first.
Deposits on new condos are usually structured in stages over time rather than paid all at once, and the specific schedule is set by the builder. During construction, buyers generally move through an interim occupancy period — living in or taking possession of the suite before the building formally registers — followed by final closing, when title transfers.
For new condominiums in Ontario, the Condominium Act provides a 10-day cooling-off period after signing, during which you can review the disclosure documents and cancel if needed. Deposit structures and other specifics will be confirmed by the builder.
Woodside Centre is at 1571 Sandhurst Circle in Scarborough, part of the City of Toronto, Ontario. This established east-end community offers access to local shopping, services, and transit connections.
The development is being built by 95 Developments. Buyers are encouraged to review the builder's disclosure documents and past work directly as part of their due diligence.
Woodside Centre is a mixed-use project offering residential suites ranging from one-bedroom layouts to three-bedroom-plus-den homes. Specific floor plans and sizes will be confirmed by the builder.
The project is in pre-construction and an occupancy date has not yet been announced. Timing will be confirmed by the builder as the development progresses.
Pricing has not yet been released. Interested buyers can register for updates to receive pricing and suite details when they become available, in Canadian dollars (CAD).
You can register your interest to receive early updates on pricing, floor plans, and sales timing. Registering early often provides first access to information as the builder releases it.
Information last updated July 8, 2026. Details are provided by the builder and may change without notice.
First access to pricing, floorplans, and availability — before the public.