Ponce 8
coming soonmixed
From $13M

Shoma Group

Ponce 8

3850 SW 8th St, Coral Gables, Florida

Ponce 8 is a new pre-construction mixed residential community by Shoma Group in Coral Gables, Florida.

Ponce 8 is a mixed-use project from Shoma Group at 3850 SW 8th St in Coral Gables. It is planned to include 201 residences, from compact homes of about 500 square feet up to layouts of roughly 1,255 square feet.

The project is at the coming-soon stage, with estimated completion in Q2 2028. Final details on design, features and pricing will come from the builder.

Key project details

Location
3850 SW 8th St, Coral Gables, Florida
Developer
Shoma Group
Home types
201 residences, approximately 500–1,255 sq ft
Pricing
From $13M
Occupancy
Estimated completion Q2 2028

Gallery

Compare Ponce 8 with…

How this listing is verified

  • ✓ Listing facts compiled from multiple public sources and cross-checked by LIQWD's audit system
  • ✓ Pricing and availability update as builders release them — last updated October 15, 2026
  • ✓ Corrections from verified agents and builders are reviewed by our team — pre-construction details change; confirm final terms with the sales team

Local amenities

Coral Gables is known for its tree-lined streets, Mediterranean Revival architecture and a walkable downtown core, and this address on SW 8th Street places residents within the wider Miami-area mix of dining, shopping and services. A verified list of nearby hospitals, schools, parks and shops is not yet available for this page, so specifics are best confirmed with the builder or on a site visit.

Getting around

SW 8th Street is the well-known Tamiami Trail corridor, a major east-west route through Miami-Dade County. Drivers in Coral Gables also have access to nearby arterial roads and regional highways, and the area is served by Miami-Dade transit. Exact routes, stations and travel times should be confirmed directly as the project progresses.

About Shoma Group

Shoma Group is a South Florida developer active in the Miami-Dade market. Specific details on its portfolio and track record are best reviewed through the builder directly, along with the sales materials for Ponce 8.

Buying pre-construction at Ponce 8

Buying pre-construction in Coral Gables usually starts with registering your interest. Registrants often receive floor plans, pricing and first access when a release opens, and early choice can mean a wider selection of layouts and floors.

Deposits on new developments are commonly staged over time, for example at signing and at later milestones, with the balance due at closing. Some projects have an interim occupancy period before final closing; the builder will outline the terms for Ponce 8 in its documents.

If the homes are sold as new condominiums, Florida law provides a 15-day rescission period under FS 718.503, allowing buyers to cancel within that window. Review all documents with a real estate lawyer before signing. This is general information, not legal or financial advice.

Frequently asked questions

Where is Ponce 8 located?

Ponce 8 is at 3850 SW 8th St in Coral Gables, Florida.

Who is the builder of Ponce 8?

The builder is Shoma Group, a South Florida developer.

How many residences are planned?

The project lists 201 residences, with sizes of approximately 500 to 1,255 square feet. It is described as a mixed-use development.

When is Ponce 8 expected to be complete?

The current estimate is completion in Q2 2028. Timelines can change, and the builder will confirm dates.

What is the sales status and how do I register?

Ponce 8 is listed as coming soon. Registering your interest is the usual way to receive pricing, floor plans and first access once sales open.

What are the starting prices?

Pricing has not been confirmed for this page. Please register to receive official pricing from the builder when it is released.

What are the deposit terms?

Deposit structures are set by the builder and are often paid in stages. The builder will confirm the schedule for Ponce 8 in the purchase documents.

Information last updated October 15, 2026. Details are provided by the builder and may change without notice.

Request pricing & availability

First access to pricing, floorplans, and availability — before the public.

Are you a real estate agent?

Your details go only to this project's representative — no spam, ever. See our privacy policy for how we handle your information.

More from Shoma Group

More new homes in Coral Gables

Are you a real estate agent? Get commission details & broker portal access on LIQWD →