5500 Dundas Street West, Toronto, ON (northwest corner of Dundas Street West and Paulart Drive), Ontario
5500 Dundas West Condos is an early-stage, pre-construction development planned for the northwest corner of Dundas Street West and Paulart Drive in Toronto's west end. The mixed-use project is proposed to include 560 units across a mix of home types.
Plans call for studio, one-, two-, and three-bedroom suites plus grade-level townhouses. With its development application submitted in January 2026, the project is still in its earliest planning phase.
Situated along Dundas Street West in Toronto's western reaches, the site sits within an established, well-serviced part of the city. Everyday needs — groceries, shops, dining, and local services — are typically close at hand along the Dundas corridor and surrounding neighbourhoods.
As this project is at an early planning stage, specific nearby amenities will be confirmed as more details are released. Prospective buyers can expect the convenience of a mature Toronto neighbourhood with a mix of retail, schools, and green space in the broader area.
The address on Dundas Street West offers connections into central Toronto and out toward the western suburbs. This part of the city is well served by TTC surface routes along Dundas Street West, and major highways serving Toronto's west end — including Highway 427 and the Gardiner Expressway/QEW — provide access across the Greater Toronto Area. Specific transit connections will be clearer as the project advances.
The builder behind 5500 Dundas West Condos has not yet been announced. Once the developer is confirmed, we'll share details about their focus and track record in the Toronto area here. In the meantime, the project's plans and application progress offer the clearest sense of what's coming.
Are you a real estate agent? Get commission details & broker portal access on LIQWD →
Buying pre-construction in Ontario typically begins with registering for early access, which puts you in line for information and often the first release of units and pricing. Early releases can matter because pricing and the best-positioned floor plans are sometimes offered first to registrants.
Deposits on new condos are usually staged over time rather than paid all at once, with instalments tied to signing and construction milestones. In many projects there is also an interim occupancy period — when you can move in and pay occupancy fees before the building formally registers — followed by final closing, when title transfers.
For new condominiums in Ontario, buyers have a 10-day cooling-off period under the Condominium Act, during which you can review the disclosure statement and agreement and cancel if you choose. Specific deposit structures and terms for this project will be confirmed by the builder.
The development is planned for 5500 Dundas Street West in Toronto, Ontario, at the northwest corner of Dundas Street West and Paulart Drive in the city's west end.
Plans call for 560 units in total, including studio, one-, two-, and three-bedroom suites, along with grade-level townhouses. Specific floor plans and sizes will be confirmed by the builder as the project advances.
Pricing has not been released yet. Prices for this Toronto development will be quoted in Canadian dollars (CAD) and confirmed by the builder closer to launch. Registering early is the best way to receive pricing as soon as it's available.
An occupancy date has not yet been announced. The development application was submitted in January 2026, and the project remains in early stages, so timing will be confirmed as approvals and construction progress.
The developer has not been publicly announced for 5500 Dundas West Condos. We'll update this page with builder details once they are confirmed.
You can register for updates through LIQWD to receive news on pricing, floor plans, and the sales launch as they're released. Early registration typically gives interested buyers first access to information and priority during a sales release.
It's a mixed-use development that includes both condominium suites and grade-level townhouses, for a total of 560 residences. The mix of home types offers options for a range of buyers.
Information last updated July 9, 2026. Details are provided by the builder and may change without notice.
First access to pricing, floorplans, and availability — before the public.