
Bayshore Grove Capital
Midway at Earlington Heights Station
Earlington Heights Metrorail Station, 2100 NW 41st Street, Miami, FL (transit station location; project street address not confirmed), Florida
Midway at Earlington Heights Station is a new pre-construction mixed residential community by Bayshore Grove Capital in Miami, Florida.
Midway at Earlington Heights Station is a mixed-use development centred on a Metrorail station in Miami. Plans call for two 15-storey towers with more than 850 workforce housing residences, from studios to three bedrooms.
Bayshore Grove Capital, with developer Vivian Dimond, leads the project, which was originally developed by Pacific & Orient Properties. A confirmed street address, sales status and construction stage have not been published.
Key project details
- Location
- Earlington Heights Metrorail Station, 2100 NW 41st Street, Miami, FL (transit station location; project street address not confirmed), Miami, Florida
- Developer
- Bayshore Grove Capital
- Home types
- 850+ workforce housing residences, studios to 3 bedrooms, in two 15-story towers
Gallery
How this listing is verified
- ✓ Listing facts compiled from multiple public sources and cross-checked by LIQWD's audit system
- ✓ Pricing and availability update as builders release them — last updated October 8, 2026
- ✓ Corrections from verified agents and builders are reviewed by our team — pre-construction details change; confirm final terms with the sales team
Local amenities
The supplied map data lists no specific nearby places for this site, so we have not named any hospitals, schools, shops or parks. Buyers should confirm the surrounding amenities with the builder and by visiting the area around 2100 NW 41st Street in Miami.
Getting around
The site is at the Earlington Heights Metrorail Station, so residents would be next to Miami-Dade's rail transit. Major routes serving the Miami area include Interstate 95 and State Road 112 (Airport Expressway), and the station area is in the northwest part of the city. Specific travel times are not provided here.
About Bayshore Grove Capital
Bayshore Grove Capital, with developer Vivian Dimond, is the current lead on the project. Pacific & Orient Properties originally developed it. Further detail on the team's track record has not been supplied, so please confirm it directly with the builder.
Buying pre-construction at Midway at Earlington Heights Station
Buying pre-construction usually starts with registering for first access. Registrants are typically contacted when pricing, floor plans and availability are released, and early buyers often get the widest choice of units.
Deposits are commonly staged over time, such as an initial deposit at signing and further instalments during construction. Many projects also have interim occupancy before final closing, when title transfers. The builder will confirm the structure for this project.
For new condominiums in Florida, buyers generally have a 15-day rescission period under FS 718.503. Whether it applies depends on the ownership type, which has not been confirmed here. Review all contracts with a real estate lawyer.
Frequently asked questions
Where is Midway at Earlington Heights Station?
It is planned at the Earlington Heights Metrorail Station, 2100 NW 41st Street, Miami, Florida. The exact project street address has not been confirmed.
What types of homes are planned?
The project includes more than 850 workforce housing residences, from studios to three bedrooms, in two 15-storey towers. It is a mixed-use development.
Who is the builder?
Bayshore Grove Capital, with developer Vivian Dimond, leads the project. It was originally developed by Pacific & Orient Properties.
What is the starting price?
Pricing has not been published. Register your interest and the builder will confirm pricing and availability.
When is occupancy?
No occupancy date has been confirmed. Timing will be set out by the builder in the purchase documents.
Is it near transit?
Yes. The project is located at the Earlington Heights Metrorail Station in Miami.
How do I register?
Use the registration form on this page to request updates. Deposit structures and next steps will be confirmed by the builder.
Information last updated October 8, 2026. Details are provided by the builder and may change without notice.
Request pricing & availability
First access to pricing, floorplans, and availability — before the public.
More from Bayshore Grove Capital
More new homes in Miami
Are you a real estate agent? Get commission details & broker portal access on LIQWD →





