
Great Gulf
5400 North Flagler Drive, West Palm Beach, FL 33407, Las Vegas, Florida
Mandarin Oriental brings a globally recognized hospitality brand to the Florida coast, developed by Great Gulf at 5400 North Flagler Drive in West Palm Beach. This is a luxury condominium offering, ranging from spacious two- to four-bedroom residences to two multi-level private villas and a full-floor penthouse.
With completion estimated between 2029 and 2031, the project is in its early stages, positioning early buyers to select from the fullest range of homes in the release.
Specific nearby amenity details for this address were not supplied, so we've kept this general rather than naming places that may not be accurate. West Palm Beach is known for its waterfront lifestyle along the Intracoastal Waterway, its downtown dining and cultural scene, and easy proximity to beaches. For the most current picture of shopping, dining, schools, and services near 5400 North Flagler Drive, buyers should confirm details directly with the builder.
Are you a real estate agent? Get commission details & broker portal access on LIQWD →
West Palm Beach is served by major regional routes including Interstate 95 and Florida's Turnpike, connecting the area north and south along the coast, while U.S. Route 1 runs close to the waterfront. Palm Beach International Airport is within the city, and regional rail options operate through the downtown core. For precise transit connections near North Flagler Drive, buyers should verify current service directly.
Great Gulf is a well-established North American builder with a portfolio spanning residential, commercial, and high-rise projects across Canada and the United States. The company is known for design-forward development and for partnering on branded residential offerings. Its involvement with the Mandarin Oriental name in West Palm Beach reflects a focus on the upper end of the luxury market.
Buying pre-construction at a project like Mandarin Oriental usually begins with registering for first access, which lets interested buyers review pricing, floor plans, and residence options as they are released. Buying early in a release often means the widest selection of layouts, floors, and views before the most sought-after homes are spoken for.
Deposits on new Florida condominiums are generally staged over time rather than paid all at once, with an initial amount at signing followed by installments tied to construction milestones. Buyers should also understand the difference between contract signing, construction progress, and final closing, when ownership transfers and the balance is due.
Under Florida law, buyers of a new condominium unit have a 15-day rescission period under FS 718.503, allowing cancellation within that window after signing the purchase agreement and receiving the required documents. This is general education, not financial or legal advice; specific terms will be set out in the builder's documents.
Pricing begins at $3,500,000 USD. As a luxury branded condominium, homes are priced by size and residence type, and final pricing will be confirmed by the builder.
The collection includes two- to four-bedroom residences of approximately 2,151 to 6,339 square feet, plus two multi-level private villas and a full-floor penthouse.
The development is at 5400 North Flagler Drive, West Palm Beach, FL 33407, along the city's waterfront corridor.
Completion is estimated between 2029 and 2031. As with any pre-construction project, timelines are subject to change and will be confirmed by the builder.
Mandarin Oriental is developed by Great Gulf, an established North American builder with a portfolio of residential and high-rise projects across Canada and the United States.
You can register your interest to receive updates on availability, pricing, and floor plans. Early registration typically provides the first opportunity to review the release when details are made available by the builder.
Deposit structures for new Florida condominiums are typically staged over the construction period, with an initial deposit at signing followed by additional installments tied to milestones. The specific schedule for this project will be confirmed by the builder.
Information last updated July 14, 2026. Details are provided by the builder and may change without notice.
First access to pricing, floorplans, and availability — before the public.