Rodeo Drive vs Glenhill: Two Lanterra Toronto Condos Compared
August 18, 2026 · by the LIQWD team

Two Lanterra condos, two different fits
Cross-shopping Rodeo Drive Condominiums and Glenhill Condominiums? Both are Toronto projects from the same builder, Lanterra Developments — which makes them easy to line up. But they part ways on the details that usually decide a purchase: entry price, suite size, and where each sits on the construction timeline.
Here is a straightforward comparison, no winner declared. The right choice depends on your budget, your space needs, and when you want to move in.
Price: where each one starts
- Glenhill Condominiums starts from $1,019,900.
- Rodeo Drive Condominiums starts from $1,149,000.
Glenhill has the lower entry point, with roughly $130,000 separating the two starting prices.
That said, the from-price is a floor, not a ceiling. Both buildings offer a wide range of suite sizes, so what you actually pay depends on the layout you choose — a larger suite in either building moves well past the opening figure. Confirm current pricing on the specific layout you are considering, and view the full listing for each project on LIQWD to see the layouts tied to those prices.
Suite sizes: how much space you get
This is where the two projects diverge most.
- Rodeo Drive Condominiums offers suites from 473 to 2,426 sq ft. The compact low end suits a single buyer, a pied-à-terre, or an investor targeting a smaller unit, while the range still stretches past 2,400 sq ft for buyers who want more room.
- Glenhill Condominiums offers 1- to 3-bedroom suites, from roughly 800 to over 5,000 sq ft. Both the starting size and the top end are dramatically bigger.
If you want the smallest, most accessible footprint, Rodeo Drive goes lower. If you want genuinely large, house-sized floor plans, Glenhill goes much higher — and buyers who need a true three-bedroom will find that layout noted at Glenhill.
Location and type
Both projects are Lanterra condos in Toronto, Ontario. On these broad strokes they match, so if staying with one builder in one city is your priority, either fits.
More specific location and building details are not published for these projects, so weigh the neighbourhood carefully on each project page rather than assuming they sit in the same part of the city. The LIQWD listings are the place to confirm the exact address and surroundings before you shortlist one.
Timeline: ready now versus estimated 2025
This is the other decisive difference.
- Rodeo Drive Condominiums was completed in 2024. It is a finished building — which matters if you want to move in without waiting, or want to see the actual product before committing.
- Glenhill Condominiums carries an estimated occupancy of 2025, meaning a later move-in and the usual considerations of a project still on its way to occupancy.
Your timeline preference may settle this on its own. A completed building removes the uncertainty of an estimated date and lets you assess a real, finished suite. A later-occupancy project can appeal to buyers who prefer more lead time before closing.
Which one fits your situation
- Move in soon: Rodeo Drive, completed in 2024. Glenhill's estimated 2025 occupancy means waiting.
- Lowest entry price: Glenhill, from $1,019,900 versus $1,149,000 at Rodeo Drive.
- Smallest, most affordable footprint: Rodeo Drive, starting at 473 sq ft versus Glenhill's roughly 800 sq ft.
- Large, multi-bedroom home: Glenhill, extending past 5,000 sq ft with 3-bedroom suites.
- Builder consistency: both are Lanterra projects in Toronto — same builder either way.
For investors weighing the two
If you are buying as an investment, keep the comparison to factors you can verify: the lower entry price and smaller minimum suite at one project, the larger layouts and later timeline at the other, and the completed-versus-2025 status. This article does not project returns or appreciation — and neither should any pitch you hear. Base your numbers on the confirmed pricing, sizes, and occupancy details on each listing.
Next steps
Both are Lanterra condos in Toronto, but they ask for a real trade-off: a completed 2024 building with a smaller minimum suite and a higher starting price, or a lower starting price with much larger layouts and an estimated 2025 occupancy.
Line up the specific suite you want against your budget and timeline, then view the full listing for each project on LIQWD to confirm current pricing and availability before you decide.
Projects in this article
Facts in this article come from the project listings LIQWD tracks and were accurate when published. Pricing, availability, and timelines for pre-construction homes change — always confirm details on the live listing or with the sales team before making decisions.
